The site at Pilot #1390, 130 Interstate Exchange Way, features six heavy-duty charging stalls built for electric semis. It is the first fruit of a collaboration the two companies announced in January 2026. Twelve additional heavy-duty charging locations are under construction, with three nearing completion.

The next sites include Flying J #1071 in Tulare, California, which was scheduled to open October 9, plus locations in Fort Stockton, Texas, and North Las Vegas, Nevada. Each site will have four to eight stalls powered by Tesla's V4 cabinet technology.